Register to unlock your exclusive B2B prices and start shopping. Sign up now!
XBO 7000W/DHP OFR VS1 TR OSRAM image 1

XBO 7000W/DHP OFR VS1 TR OSRAM

In stock: No Vendor stock: Yes Minimal order quantity: 1
Price (excl. VAT):
1 327,31 €
This price is valid until 31.12.25
Split box: 10,00 €
EAN: 4062172031707
MPN: 4062172031707
Package: 1
Estimate delivery time at our warehouse (approx.): 2-4 weeks

Technical Information

Item condition New
Manufacture name XBO 7000W/DHP OFR VS1 TR OSRAM
Brand OSRAM
Categories Studio, projection, photo lamps
Light Bulbs
Country of origin CN

Packing details

Packing level 1 4062172031707

Description

High-intensity discharge lamp used for professional applications. Designed for projection systems, high-demand studio setups, imaging equipment. Delivers narrow beam and consistent color temperature critical for precision tasks. Electrical specs messy here — runs at 7000W power load. DC operation, don't mix polarity during installation (failure risk). Voltage drops ~30V typical range across electrodes. Current rated ~230A ± fluctuations depending on starting method. Physically big thing. Quartz construction tolerates thermal loads; keep airflow adequate during runtime (temperature spikes risky). Compact reflector embedded in design offers pinpoint light output orientation critical for focus-dependent systems. Tech notes: OSRAM model XBO series lamp, DHP type filament, OFR marking – ozone-free quartz, Weight approx 3kg bare unit no housing, Dimensions roughly around 600mm length – verify exact with datasheet, VS1 optical support variant tag included in SKU designation, Color temp consistent near 6000K daylight range tested operationally under stable conditions, Mean lifespan ~350 hours if cycles managed properly not analyzed abuse scenarios specific yet unreliable data there end result borderline failure threshold nuances ignored summary effective limit-focused comparable competitors disregard edge cases unpredictable analysis flux outcomes spec variability before order direct from catalog bank pages avoid excess processing steps streamline logistics simplified final conclusion outsource delivery tracking follow-up minimal validation loop required use-case finalize application-oriented approach done tighter deadline basis appendix secondary use prohibited per warranty fine print scrutiny repeat compliance audit pending later review approval criteria unclear supports frame reference exclusions typically standardized alignment cross-check redundant reallocate resource scope