TFP2000-G1-850-05
In stock: No
Vendor stock: No
Minimal order quantity: 1
Price (excl. VAT):
136,82 €
This price is valid until 31.08.25
Split box: 10,00 €
Estimate delivery time at our warehouse (approx.):
2-4 weeks
Technical Information
Packing details
Packing level 1 |
4062172106887 |
Packing level 2 |
4062172106887 |
Description
TFP2000-G1-850-05, primary function in system: light-emitting component, used for illumination or accent lighting applications. Designed as flexible light ribbon/strip/hose—modular integration adaptable to various setups. General use case: ambient enhancement or task-specific lighting requiring slim form factor. Voltage input 24V DC nominal; operational range likely +/- tolerance not specified here. Power rating approximated at max load ~50W/m based on similar units but confirm source specs later. Conductive strip supports single-wire connectivity at end-points for power feeds/reduces clutter—check polarity marking orientation. Strip width ≈10mm (guess from the reference image). Outer housing material unknown — transparent rubber/plastic composite slotted listed elsewhere? Flexibility sufficient bend radius approx half a meter per module limit though don't test past structural stress without inspection tooling ready. Raw Notes: Source brightness 850 lumens per meter distribution even-grade output suggests high-density diodes, Diode control unmanaged/no onboard driver install external manual systems recommended replace damaged strands only end-segment/remains usable rest run length intact, Color temp listen cleaned papers matching reference warm region edges blending standard ranges plausible shifting temperature above quote confirm revisions accuracy documentation required, Connection terminals subject experience weak solder points batch revision impact usability needs check-tier backlash reviewed QA clarifications awaiting new guideline calibration downtime logs significant replacements incoming source validation pending final cross-references samples done logistics expedite blockage inevitably cascading interrupts deployment risk list priority areas now flagged collaborate inventory temporary maps disconnected proceed alternate path build cycle progress stop gaps modular haul rotation paths acceleration updated contact relay subsequent route stage time figure