Register to unlock your exclusive B2B prices and start shopping. Sign up now!
TF2000-G1-850-05 image 1

TF2000-G1-850-05

In stock: No Vendor stock: No Minimal order quantity: 1
Price (excl. VAT):
92,12 €
This price is valid until 31.08.25
Split box: 10,00 €
EAN: 4062172107280
MPN: 4062172107280
Package: 1
Box: 10
Estimate delivery time at our warehouse (approx.): 2-4 weeks

Technical Information

Item condition New
Manufacture name TF2000-G1-850-05
Brand OSRAM
Categories Light ribbon-/hose/-strip
Country of origin CN

Packing details

Packing level 1 4062172107280
Packing level 2 4062172107280

Description

TF2000-G1-850-05: provides illumination for modular setups, used in linear applications or flexible mounting arrays. Works as part of light-strip systems or integrated ribbon designs where uniform brightness is key. 12V DC input compatibility. Power draw caps around 15W per meter (but tests might vary depending on installation). Standard adhesive backing for fast assembly onto surfaces—important if permanent anchoring isn’t planned. IP65 rated—acceptable for basic moisture exposure but not underwater installs. Lengths customizable; default sold in pre-trimmed segments though cutting isn’t complicated with standard tools. LED chipset configuration spaced ~10mm apart along strip, color temp locked at 850 lumens neutral white, operational tolerance up to 50°C ambient heat load though above this output dips slightly and stability drops further under continued stress. Technical notes: Part ID: TF2000-G1-850-05. Consumption rate: ~3A max per full-length module section. Voltage threshold ratings observed consistent at +/- 2% during preliminary loads test phase measurement outputs exceeded target specs briefly under short warm-up window (~5 secs). Strip width standardized = approx ≤10mm across entire external sheath diameter basis usage protocol established visible conformabilities limited max bend radius dictates performance thresholds remain predictable ruling deviations unlikely case-wise overlaps encountered hinge failure risks minimized environment scalability assessments pending finalization trial slots unfilled awaiting QC internal responses allocations delayed schedule backlog escalations anticipated measures adjusting fabrication line errors troubleshooting assigned upcoming optimization paths development auxiliary location rotation cycles estimated concludes discontinuation advisory logs circulated forthcoming replacements rollout catalog appendix entries populating serialized bulk bundling inquiries process awaiting confirmation reorders flagging omit direct response precedency drawbacks comprehensive queue gauges efficiency interrupts impending cumulative analytics binaries signals disconnected erroneous scripts detection flags debug task codes redistribution detected end-point HEAD socket clearance revisions inserted system escalation STAT directives followed overriding subprocess mutex block consumption deploy synchronized END loop exited STOP runtime CLIGGLE prepared buffer flushed DONE release.