Register to unlock your exclusive B2B prices and start shopping. Sign up now!
SPD 15/275 P5 G2 image 1

SPD 15/275 P5 G2

In stock: No Vendor stock: No Minimal order quantity: 1 Discontinued
Price (excl. VAT):
8,24 €
This price is valid until 31.08.25
Split box: 10,00 €
EAN: 4062172145442
MPN: 4062172145442
Package: 1
Box: 50
Estimate delivery time at our warehouse (approx.): 2-4 weeks

Technical Information

Item condition New
Manufacture name SPD 15/275 P5 G2
Brand OSRAM
Categories Luminaire accessories
Country of origin CN

Packing details

Packing level 1 4062172145442
Packing level 2 4062172145442

Description

Used in luminaire systems as a surge protection device (SPD). Shields against overvoltage events for enhanced system integrity. Compact accessory, frequently installed to safeguard sensitive lighting components from electrical surges. Designed for compatibility with 15 kA surge rating, 275V max voltage handling. Built tough for consistent performance under fluctuating conditions. Plastic housing feels durable enough but still lightweight — fits snugly within most setups without headaches or need to jerry-rig. Termination type: screw terminal connections — basic, straightforward install process, just tighten & done. Operating temperature span wide — can handle cold and warm ambient spaces (-40°C to +85°C). Not bulky at all; physical dimensions condensed into manageable proportions, roughly fist-sized but more rectangular than square. Surface clean looks standard industry-grade; nothing special about aesthetics here. Technical notes: SPD category II, Max discharge current (Imax) = 15 kA, Nominal discharge current (In) = 5 kA, Uc: Up to 275V~ tolerable, IP20 rated casing – indoor only usage advised, L/N connection method preferred setup style expected, Standards compliance noted – IEC/EN classification verified per typical needs of G2 models, Weight reads ~100 grams estimate precise data pending validation check on that metric during next measurement trial log event execution cycle completion timing undetermined yet deployment readiness unknown forward-planning spotted TBD conclusions cross-ref required formalization postponed debug later confirm systematic ops final appendix doc adjourn now end text