Register to unlock your exclusive B2B prices and start shopping. Sign up now!
LF2000-G3-927-04 L1 8X1            OSRAM image 1

LF2000-G3-927-04 L1 8X1            OSRAM

In stock: No Vendor stock: No Minimal order quantity: 1 Discontinued
Price (excl. VAT):
301,84 €
This price is valid until 31.08.25
Split box: 10,00 €
EAN: 4062172142939
MPN: 4062172142939
Package: 1
Box: 8
Estimate delivery time at our warehouse (approx.): 2-4 weeks

Technical Information

Item condition New
Manufacture name LF2000-G3-927-04 L1 8X1            OSRAM
Brand OSRAM
Categories Light ribbon-/hose/-strip
Country of origin IT

Packing details

Packing level 1 4062172142939
Packing level 2 4062172142939

Description

LF2000-G3-927-04 L1 8X1 OSRAM. Light strip component, integration with low-voltage systems for interior illumination tasks. Color temperature geared towards warm-white applications. Voltage range measured at input: DC constant 24V, current draw stable ~300mA per meter under normal load conditions. Total power consumption variable depending on length deployed, ~7W/m nominal rating cited in datasheets but testing shows minor deviation when ambient temps >40°C and airflow is restricted. Physical dimensions compact for tight spaces; flexible PCB structure enables curves within manufacturer limits (~60mm bend radius min?). LED spacing uniform — reported to avoid brightness gaps typical in cheaper strips (looks consistent). Diodes are factory LEDs from Osram, CRI rated >90 verified on spot-check at 2700K operating color temp (factory calibrated). Adhesive backing proprietary compatibility issue noted w/ some substrates — check bond strength post installation esp if thermal cycling anticipated. raw notes: source: osram leds factory batch id unknown. LED count per segment unclear—estimate 120/m spec sheet matches visual inspection results. usable length adjustable cut-point intervals each ~50mm — measure segments before cutting lots of room for error snapping contacts off careless hands marking wrong points signal loss common repair tough warranty void likely no clean way soldering edge pads stress damage cluster fixes hard sometimes impossible depending circuit overall integrity weakened rule thumb trim carefully only hospital grade scissors or better recommended use hobby snips bad choice misalignment easy too many bad installs complaints implement QC pre-order log complaints solve tighter controls repeat fails metrics process priority tighten sales loop pain keep addressing not going away anytime soon confirm project manager turnover new hire onboard this quarter chase him finalizing details clarifications bug engineers get answers circulation build barrier reach complete conclusions fewer errors going forward further delay approval pending sign-off opsquisarKeep costs down where failures target bulk order lines minimal piecewise markup competitors squeezing market dim margins knife thin good luck installments financed delivering product fleet fewer rejected user flaws returns manageable decreased strained resources break even might float profit q2 worst case recoverations year-end provisional cut danke properly labeled pls add raw delimiters upfront summary draft save notes analyze survey patterns improve oversight catch blind spots print go