Hotel switch insert, room unit 505KO5VEUM24
In stock: No
Vendor stock: No
Minimal order quantity: 1
Price (excl. VAT):
39,97 €
This price is valid until 31.12.25
Estimate delivery time at our warehouse (approx.):
2-4 weeks
Technical Information
Item condition |
New |
Manufacture name |
Hotel switch insert, room unit 505KO5VEUM24 |
Brand |
Jung
|
Categories |
Switches
|
Country of origin |
DE |
Harmonized System Code |
8536 5080 00
|
Nominal voltage |
24 V |
Mounting method |
Flush mounted (plaster) |
Assembly arrangement |
Basic element |
Method of operation |
Rocker/button |
Rated current |
0 A |
Type of fastening |
Screw mounting |
Wiring system |
Series switch |
Packing details
Packing level 1 |
4011377162044 |
Packing level 2 |
4011377162044 |
Other Technical data
Halogen free |
Yes |
With mounting plate |
No |
Connection type |
Push-in clamp |
Illumination |
Yes |
Built-in depth |
0 mm |
Feedback-signal contact |
No |
Type of lighting |
LED exchangeable |
Number of rockers |
0 |
RAL-number (similar) |
0 |
Switching current for fluorescent lamps |
0 AX |
Push button switch |
No |
Washing machine switch |
No |
Device width |
0 mm |
Device height |
0 mm |
Device depth |
0 mm |
Label space/information surface |
No |
Function lighting |
Control and orientation |
Number of modules (module system) |
0 |
Min. depth of built-in installation box |
0 mm |
Downloads
Description
Hotel switch insert, room unit 505KO5VEUM24.Category:Switches.Source:https://bankoflamps.com/hotel-switch-insert-room-unit-4011377162044;Designed for basic electrical control systems with flush-mounted installation in plaster setups.Includes rocker/button operation and LED exchangeable illumination function for control and orientation capability.Wiring system configured as a series switch;nominal voltage rated at 24 V. Halogen-free construction.Push-in clamp connection type present for streamlined wiring installations.Surface protection unlisted, suggests variable conditions may apply to external casing durability or environmental resistance factors during usage runtime analysis process deployment stage approvals confirmatory workload adjustments