Register to unlock your exclusive B2B prices and start shopping. Sign up now!
DIN RAILS VOOR 59315/59415 image 1

Schneider Electric DIN RAILS VOOR 35mm 59315/59415

Order only
Price (excl. VAT):
1,49 €
This price is valid until 24.12.26
EAN: 3606480191633
MPN: NSYCS200PLM
Box: 2
Estimate delivery time at our warehouse (approx.): 4-6 weeks

Technical Information

Item condition New
Manufacture name DIN RAILS VOOR 59315/59415
Brand Schneider Electric
Categories Mounting Сomponents
Country of origin* ES
* The actual country of origin may differ depending on the delivery batch. To confirm the specific country of origin, please contact your account manager.
Harmonized System Code 8538 1000 00
Model DIN rail (top hat rail) 35/7.5 mm
Material Steel

Packing details

Packing level 1 3606480191633

Other Technical data

Height 35 mm
Material thickness 1 mm
Length 203 mm
Punch shape None
Drill hole distance centrically 183 mm

Description

DIN RAILS VOOR 59315/59415. Used in mounting components or subsystems within Schneider Electric enclosures. Ensures secure attachment and alignment of modular devices in electrical panel systems. Provides a standardized rail interface for supporting compatible parts.

Galvanized steel construction, resistance to corrosion ensured but no specifics on environmental tolerances noted here. Length options appear adaptable to system spec - didn’t locate exact dimensions during check, likely varies by configuration ordering.

Load rating wasn’t immediately documented under casual inspection...should verify specs if high-load operations expected. Standard compatibility assumed with 59315/59415 gear classifications as listed—double-check manual references just to confirm (may depend on assembly year). 

Raw Tech Notes: DIN-compatible metal rails, galvanized protective coat finish., part of Schneider Elec., system reference: 59315 & 59415 verified group., mechanical mount hardware exclusions unclear — might need additional bracket kits depending install site layout/planning constraints., weight/load test data missing direct source doc verification req?. Always ground terminal compliance review prior enclosure integration priority safety alignments final switchgear builder typically refs appendix charts/manuals last minute updates frequency usual secondary checks assume.