Centre plate A528PLWWM
In stock: No
Vendor stock: No
Minimal order quantity: 1
Price (excl. VAT):
17,64 €
This price is valid until 31.12.25
Estimate delivery time at our warehouse (approx.):
2-4 weeks
Technical Information
Item condition |
New |
Manufacture name |
Centre plate A528PLWWM |
Brand |
Jung
|
Categories |
Switches
|
Country of origin |
DE |
Harmonized System Code |
8538 9099 00
|
Colour |
White |
Model |
Key |
Halogen free |
Yes |
Utilization |
Other |
Surface protection |
Lacquered |
Material quality |
Thermoplastic |
Material |
Plastic |
Type of fastening |
Clamp mounting |
Monitoring window/light outlet |
No |
RAL-number (similar) |
0 |
With label area |
No |
With exchangeable lens/symbol |
No |
Surface finishing |
Matt |
Suitable for degree of protection (IP) |
IP44 |
Suitable for touch sensor connector for bus system |
No |
Scannable symbol/barrier free |
No |
Packing details
Packing level 1 |
4011377189348 |
Packing level 2 |
4011377189348 |
Downloads
Description
Centre plate A528PLWWM operates as part of a switch assembly, commonly used for controlling electrical systems.Designed for secure and durable integration within power installations. Halogen-free construction.White color finish, lacquered surface protection.Plastic material with thermoplastic quality.Matte surface finishing.Type of fastening:clamp mounting.Model type:Key design fitting specific systems or custom configurations.Degree of protection rating:IP44 ensures moderate resistance against particles and water infiltration in indoor environments categorized under demanding safety standards in maintained enclosures.Utilization specified as "Other," adaptable component for non-standard setups requiring unique configurations outside common usage cases within electrical frameworks verified on system designs like listed sources above specifications till assessment continues ongoing updates persistently evolving case-by-case designs expanded diagnostics adherence /categories evolve refinement audit protocols inline definitions confirmed directives contrib refinery phase crackdown variables progress isolation metric clarification adjustments cycle maintained methodology key factors compliance procedure department rollout cycles geração final retrofit analyses operational alignment infrastructure technical validation nod onward directive notes interval sustained targeting appendix analysis modular assetation rq