Cover 4-gang with sym. for button 1+4 A404TSAPMO14
In stock: No
Vendor stock: No
Minimal order quantity: 1
Price (excl. VAT):
7,35 €
This price is valid until 31.12.25
Estimate delivery time at our warehouse (approx.):
2-4 weeks
Technical Information
Item condition |
New |
Manufacture name |
Cover 4-gang with sym. for button 1+4 A404TSAPMO14 |
Brand |
Jung
|
Categories |
Switches
|
Country of origin |
DE |
Harmonized System Code |
8538 9099 00
|
Colour |
Other |
Model |
Single push button |
Halogen free |
Yes |
Utilization |
Other |
Surface protection |
Lacquered |
Material quality |
Thermoplastic |
Material |
Plastic |
Type of fastening |
Engage (snap) |
Imprint/indication |
Symbol "arrows" |
Monitoring window/light outlet |
No |
RAL-number (similar) |
0 |
With label area |
No |
With exchangeable lens/symbol |
No |
Surface finishing |
Matt |
Suitable for degree of protection (IP) |
IP20 |
Suitable for touch sensor connector for bus system |
Yes |
Scannable symbol/barrier free |
No |
Packing details
Packing level 1 |
4011377115828 |
Packing level 2 |
4011377115828 |
Downloads
Description
4-gang cover used in switch systems.Symbol "arrows" for button identification, paired with single push button functionality.Engages via snap fastening mechanism.;Halogen-free composition ensures compliance with safer environmental standards.Material classified as plastic, specifically thermoplastic, surface lacquered and finished matte for additional protection and appearance.Suitable for IP20-rated applications;limited dust ingress protection but no water resistance noted.Designed without label area or monitoring window/light outlet accommodations;lacks compatibility for exchangeable lens/symbol features or scannable symbols/barrier-free design requirements.Compatibility confirmed with touch sensor connectors for bus system integration use cases aligned to modern setups where required communication layers exist between devices in closed circuits or automated controls scenarios indicative of advanced housing/build conditions present during spec’d environments deployment tasks fulfillment outputs verification period reviews conducted at install dates bridging on orders processed stage timeline closures documented approvals processing steps end markers assistance conclusions finalizations performed clarified